Year: 2024
Location: Vista, CA
Job Type: Public Works
Project Size: 150,000 Sq Ft
We’ve been hard at work at Foothill Oaks Elementary, focusing on restoring water-damaged exterior walls and upgrading various systems. Key improvements included repairing the walls with fresh stucco and paint, installing new gutters for better water drainage, and jetting existing storm drains to prevent future flooding and ensure proper water flow. Additionally, we replaced the fire alarm boxes and upgraded the PA system affected by water intrusion to enhance safety and communication. These upgrades provide long-lasting protection, improved functionality, and a refreshed exterior appearance, ensuring everything is safe and sound.